Saturday, 10 March 2012
Arrival
Well Folks the 2012 trip from SLPC is well under way, we have all arrived safely and all projects have got off to a flying start. Library is a bigger paint job than expected however with Arthur Mathieson on the scene everything has been take with a pinch of salt. Computer lab was looking a bit depleted but not every problem is impossible and David Fell has been working away and everything is on the up. We have had some torrential rain at least once each day (makes it feel like home) and the dam is now looking like it may flood over the road and block us off from the school, nothing will stop us though. Well lots of work to be done so over and out for the meantime.
Subscribe to:
Post Comments (Atom)
Great news, Calum, nothing stops the South Leithers when they're at Chipembi, floods, huge paint jobs, computer labs... All in a day's work :)
ReplyDelete